Evening time Noise Monitoring Results
Station M5, Chuk Lam Ming Tong(near entrance)
Date Start Time End Time  Weather Noise level (dB(A)) Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
20/03/2014-a 22:45 22:50 Fine 62 64 51 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 21.5 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
20/03/2014-b 22:50 22:55 Fine 60 63 50 21.5 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
20/03/2014-c 22:55 23:00 Fine 62 65 52 21.5 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
20-Mar-14 22:45 23:00 Fine 62 64 51 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 21.5 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
Maximum 62
Minimum 60